1.0) OBJECTIVE:
To describe a procedure for the preventive maintenance of Dry Syrup Powder Filling Machine.
2.0) SCOPE:
This SOP is applicable for preventive maintenance of Dry Syrup Powder Filling Machine
- RESPONSIBILITY:
Assistant Engineer / Above shall be responsible for implementation and compliance of the SOP.
- ACCOUNTABILITY:
Manager- Engineering / Manager – Production & Head QA shall be accountable for implementation and compliance the procedure mentioned in this SOP.
- ATTACHMENT:
Preventive Maintenance Checklist of Dry Syrup Powder Filling Machine -Attachment-I
- PROCEDURE:
- Preparation of preventive maintenance plan:
- Inform the concern person before starting preventive maintenance.
- Ensure that no activities are carried out in the respective machine.
- Ensure that the respective system electrical supply is switched “OFF”
- Before carrying out the preventive maintenance display status board as “UNDER PREVENTIVE MAINTENANCE” on the electrical panel and machine.
- FREQUENCY:
- Quarterly
- CHECKLIST:
- Check all electrical terminals of main supply and machine for tightness.
- Check gear box and motor for proper working. Top-up gear oil, if required.
- Check hopper and auger alignment for proper powder filling.
- Check foot rest working for powder filling.
- Check bottle holding jaw for proper working.
- Check and lubricate bearings and nut for wear and tear where applicable.
- Close all the lids for proper closing.
- Start and run the machine in Auto/Manual mode.
- Check for any abnormal noise in the machine.
- After completion of the above procedure Remove the “UNDER PREVENTIVE MAINTENANCE” status board from the machine and the respective electrical panel.
- Affix the Preventive Maintenance Status on machine as per Attachment – I of SOP/EN/003.
- Update the status label of the machine after the completion of preventive maintenance and assembly respectively.
- After performing the preventive maintenance activity of machine, respective area supervisor shall check and note the details on respective Machine Operation & Cleaning Log Book.
- Engineering Supervisor/ above shall update the activity in respective formats of SOP for Dry Syrup Powder Filling Machine (SOP/EN/061).
- Preparation of preventive maintenance plan:
- REFERENCES:
In-house
- ABBREVIATIONS:
- SOP : Standard Operating Procedure
- : Engineering
- DISTRIBUTION LIST:
Quality Assurance
Production
Engineering
10.0 HISTORY OF REVISION:
Revision No. | Effective Date | Reason for Revision |