- OBJECTIVE:
To describe a procedure for the preventive maintenance of Effluent Treatment Plant.
- SCOPE:
This SOP is applicable for preventive maintenance of Effluent Treatment Plant
- RESPONSIBILITY:
Assistant Engineer/Above shall be responsible for implementation and compliance of the SOP.
- ACCOUNTABILITY:
Manager-Engineering / Manager-Production / Head-QA shall be accountable for implementation and compliance the procedure mentioned in this SOP.
- ATTACHMENT:
Preventive maintenance checklist of Effluent Treatment Plant. – Attachment -I
- PROCEDURE:
- Preparation of preventive maintenance plan:
- Ensure that no activities are carried out in the respective machine.
- Ensure that the respective system electrical supply is switched “OFF”
- Before carrying out the preventive maintenance display status board as “UNDER PREVENTIVE MAINTENANCE” on the electrical panel and machine.
- FREQUENCY:
- Quarterly
- CHECKLIST:
- Check the electrical terminals of main supply and electrical components of machine panel.
- Check the condition of sludge settling filters in primary and secondary tanks. Replace if required.
- Preparation of preventive maintenance plan:
6.3.3 Check any abnormal sound and overheating of motors and pumps.
- Tighten the Flange bolts and base bolts of motors.
- Check the motors for proper working, check bearings and change if required.
- Check the condition of the mechanical seal/gland, replace it if found any damage.
- Check for shafts of motor, impeller condition of pumps and observe the rotation by rotating
manually with hand, which should be balance equally while rotation.
- Check the condition of the mechanical seal/gland, replace it if found any damage.
- Check the working of all valves, replace if any leakage found.
- Clean the collection tank, if required.
- Clean the sludge tank , if required.
- After completion of the above procedure remove the “UNDER PREVENTIVE MAINTENANCE” status board from the machine and the respective electrical panel.
- Affix the Preventive Maintenance Status on machine as per Attachment – I of SOP/EN/003.
- Update the status label of the machine after the completion of preventive maintenance.
- Operator/Junior Engineer/ above shall record the activity in respective attachment of SOP for
Maintenance of Effluent Treatment Plant. (SOP/EN/084).
REFERENCES:
In-house
- ABBREVIATIONS:
SOP: Standard Operating Procedure
Engg: Engineering
- DISTRIBUTION LIST:
Engineering
Production
Quality Assurance
10.0 HISTORY OF REVISION:
Version No. | Effective Date | Reason for Revision |
Attachment-I
Preventive Maintenance Checklist of Effluent Treatment Plant
Area:
ID No: Date:
Frequency:
Sr. No. |
Particulars |
Status |
|
Check the electrical terminals of main supply and electrical components of machine panel. | |
|
Check the condition of sludge settling filters in primary and secondary tanks. Replace if required | |
|
Check any abnormal sound and overheating of motors and pumps. | |
|
Tighten the Flange bolts and base bolts of motors. | |
|
Check the motors for proper working, check bearings and change if required. | |
|
Check the condition of the mechanical seal/gland, replace it if found any damage. | |
|
Check for shafts of motor, impeller condition of pumps and observe the rotation by rotating manually with hand, which should be balance equally while rotation | |
|
Check the condition of the mechanical seal/gland, replace it if found any damage. | |
|
Check the working of all valves, replace if any leakage found. | |
|
Clean the collection tank, if required. | |
|
Clean the sludge tank , if required. |