Procedure for operation of Diesel Generator

Procedure for operation of Diesel Generator

  • OBJECTIVE:

To describe a procedure for the operation of Diesel Generator.

  • SCOPE:

This SOP is applicable for procedure for the operation of Diesel Generator at

  •  RESPONSIBILITY:

      Assistant Engineer/Above shall be responsible for implementation and compliance of the SOP.

  • ACCOUNTABILITY:

Manager-Engineering / Manager-Production / Head-QA shall be accountable for implementation      and   compliance the procedure mentioned in this SOP.

  • ATTACHMENT:

Operation Of Diesel Generator                                      – Attachment-I

  • PROCEDURE:
    • PRE STARTUP:
      • Open the main door of generator.
      • Check the battery voltage , Coolant level, fuel level.
      • The coolant level and lubricating oil level to be maintained at maximum level.
      • In diesel tank the diesel level should be at least ¾ full.
      • Diesel tank outlet valve should be open.
      • Check the Radiator water level.
    • OPERATION:
      • Turn the two way selector switch in clockwise direction to START the Generator HMI.
      • HMI will show “Generator at rest”
      • Press the keypad buttons to operate the HMI.
      • Wait for HMI until its screen display “Generator available” option.
      • As “Generator available” option appear on display screen , push MCCB in upward direction.
      • Close the main door of generator.
      • Go to main panel room and operate change over switch of Generator Incomer.
  • SHUTOFF
    • As the supply from HPSEB is resumed, operate the change over switch of HPSEB incomer and transfer the load to HPSEB incoming supply.
    • Go to generator and open the main door.
    • Push down the MCCB.

Record all the observations in respective attachment of SOP for operation of diesel generator

  • Turn the two way selector switch in anticlockwise direction to switch OFF the HMI.
  • Close the main door of generator.

 REFERENCES:

In-house

  • ABBREVIATIONS:

SOP: Standard Operating Procedure

Engg: Engineering

  • DISTRIBUTION LIST:

Engineering

Production

Quality Assurance

   HISTORY OF REVISION:

Version No. Effective Date Reason for Revision

ID No :_________________                                         

 

 

Date

 

Start time

 

Stop Time

 

Running Time

 

Total Running  Hours

 

Diesel Added

 

       Start by

 

    Stop by

 

Remarks

                 
                 
                 

 

SOPs